Projects

Chevron Duri Riau

Medco Energi

Total area 339.000 sq ft
  •  Coating for High Temperature Pipeline, 2008-2010
  • Coating Pressure Vesseland Underground Pipeline,2008-2009
  • Coating for Internal Pipeline, 2009
  • Coating Service forUnderground Pipe Crossing, 2010-2012
  • Coating Wash Tank CGS 3 & 4 DuriHeavy Oil Operation Unit, 2011
  • Coating Services for Pipe and Equipment, 2012-2015 (C830055)
  • Contract Extension Amendment (C830055), 2016
Total area 87.500 m2 2010-2011
  • Coating Pipeline &
  • Rig Emsco& Drecoin Rimau Area

Kondur Petroleum S A 

Siemens Petrobras

Area 12.000 m2 (2011-2012)
  • Blasting &
  • Coating Platform Maintenance in Kurau
TOTAL AREA 23.000 m2 (2015)
  •  E-house Module Blasting, Painting, & Inspection.

Leighton & Total Bangun Persada

sinar mas oleochemical

New australian embassy patra kuningan jakarta, 2015
  •  spray cold insulation polyurethane foam total area 18.471 m2
  •  spray polyurea waterproofing  total area20.854 m2
TOTAL AREA 5000 m2 (2016)
  • spray waterproofing polyurea

PT Amman Mineral Nusa Tenggara

Amman Project, 2018

Our Clients

Contact us
email :
Main office :
Jl.Raya Maluk No.07
Rt.01/Rw.01 Dusun Mekar Sari
Desa Bukit Damai Kecamatan 
Maluk Kabupaten Sumbawa Barat
Nusa Tenggara Barat. 84357
Tel. : (0372) 635 246
Fax. : (0372) - 635086
Representative  office :
 Ruko Golf Lake Residence Venice
Blok B no.18-19 RT/RW 014/011
Jln. Kamal Raya Outer Ring Road
Kelurahan Cengkareng Timur 
Kecamatan Cengkareng
Jakarta Barat 11730
(021) 229 59 888
© Copyright www.bisma-sumbawa.com . All Rights Reserved.